Planned Change Operation – Closed-Loop Intelligent Planned Change Control
Acknowledging Events
Change Tracker summarizes File Integrity Monitoring (FIM) changes in simple terms. For example, for File system Events, the Event Description begins with ‘New File’, ‘Changed File’, or ‘Deleted File’.
For more details, click Event Description for any Device Event to view the full details of the change.
After you review and approve the Event as valid and desirable, you can acknowledge it and assign it to a Planned Change.
Select one or more Events to acknowledge, then use the ‘Actions’ button to access the available options.
The Default option uses ‘Acknowledge Events under Planned Change’ and assigns the events to the ‘Manually Acknowledged Changes’ Planned Change.
Change Tracker now categorizes the Event as a ‘Planned Change’, so the filter control for ‘Unplanned’ Planned Change Status masks it. Edit the filter to show Planned Changes only, and the Event becomes visible again.
Hover over the Planned link to display the name of the Planned Change. Click the link to go to the Planned Changes page, where you can analyze the events associated with the Planned Change.
Intelligent Change Control
Creating an Intelligent Planned Change is a point-and-click operation. Select the event or events to include in the Planned Change definition. Change Tracker creates a separate rule for each event.
As before, use the Actions button but this time, use Create a new Planned Change to capture these events.
By default, the Planned Change format includes only the ‘event donor’ Device Group, but you can select other or different groups. Similarly, the Planned Change window start time defaults to the donor event time and remains an ‘ongoing’ open-ended window, but you can edit these settings too.
Now delete the FIM_Test file created previously, then recreate the same file.
Finally, create a new file in /etc called Unapproved_FIM_Test, then refresh the Events page.
Now Change Tracker automatically analyzes each event and applies the Intelligent Planned Change rules to it in real time.
Based on the default ruleset, FIM_Test file operations are now approved, so Change Tracker
automatically acknowledges deletions, additions, and even changes as a ‘known-good’ change.
However, Change Tracker still flags other file change operations that don't match the rule as Unplanned changes.