Editing Existing Reports
Avoid editing existing reports unless there are changes to a job’s settings at the global level, job group level, or job level. Changes to when Enterprise Auditor collects data, the types of data it collects, and the properties of that data don't appear in a report’s configuration. As a result, generated reports could appear with blank fields or misleading information about the purpose of the collected data, unless you modify the report to reflect the changes to the job's settings. To modify a report, use the Report Configuration Wizard.
To modify an existing report:
Step 1 – Navigate to the Reports node that contains the report.
Step 2 – Click the Configure button next to the report you want to modify.
Step 3 – Use the Report Configuration wizard to make any required changes. See the Report Configuration Wizard topic for instructions.
- You must go through all pages of the wizard, and click Finish on the final page to save your changes. Skip any sections or pages that don't require changes to the existing configuration. You can click Cancel on any page to exit the wizard without saving your changes.
Enterprise Auditor saves your configuration updates. To view the updated report you need to first generate the report or run it's associated job. See the Viewing Generated Reports topic for additional information.